Page 183

Hytek Catalogue Retail 2013-14

Heating Oil & Fuel Tank Equipment 40/32mm COMPRESSION TERMINATION 50mm pipe 63/50mm pipe UPP Pipework System Installation & technical specification - Bend radius 1.5m (5ft). Can be used above ground. - Pressure rated primary to 10 bar (145 psi) at 20°C. - Pressure rated secondary to 4 bar (58 psi) at 20°C. - Rupture pressure is 40 bar (600 psi). - Recommended burial depth is a minimum of 300mm (12”). - All trenches should be sloped back towards the tank with a recommended gradient of 1:100. 15cm (6”) bed of backfill material should be laid under the pipe. Acceptable backfill material: Well-rounded pea gravel or well-graded sand, max particle size 20mm (3/4”). No more than 3% of particles should pass through a 2.5mm (1/8”) screen. - See pages 216 - 225 for more info on UPP pipework. UPP Single Containment - UPP extra lined pipe features a tough, specially bonded nylon liner. It comes in a variety of diameters & in either straight lengths or coils. Prices are per metre. Stk Code Description List U-01.32.LS (100) 32mm (1”), 100m coil POA U-01.50.LS(50 50mm (11⁄2”), 50m coil POA U-01.50.LS(100 50mm (11⁄2”), 100m coil POA U-01.63.LS(100 63mm (2”), 100m coil POA UPP Secondary Containment - The Secondary Containment system features a coaxial sleeve pipe which is pre-fitted over UPP extra primary pipe enabling all sizes of fuel & vapour lines to be installed with an uninterrupted interstitial space between the dispenser or fill point with leak detection connections if required. Prices are per metre. H See page 220 for Gemini system Stk Code Description List U-01.40.32.LS(50) 40/32mm (1”), 50m coil POA U-01.63.50.LS(30 63/50mm (11⁄2”), 30m coil POA U-01.63.50.LS(100 63/50mm (11⁄2”), 100m coil POA U-01.75.63.LS(30 75/63mm (2”), 30m coil POA U-01.75.63.LS(50 75/63mm (2”), 50m coil POA Copyright HYTEK (GB) LIMITED 2013 183


Hytek Catalogue Retail 2013-14
To see the actual publication please follow the link above